Installation, Installation 3.1 installation – KROHNE OPTIBAR PM 5060 C Ex d ia EN User Manual
Page 12
3
INSTALLATION
12
OPTIBAR 5060
www.krohne.com
07/2014 - 4003592001 - AD OPTIBAR 5060 Exd ia R01en
Installation
3.1 Installation
Installation and setup must be carried out according to the applicable installation standards (e.g.
EN 60079-14 or IEC 60079-14) by qualified personnel trained in explosion protection. The
information given in the manuals and the supplementary instructions must be observed at all
times.
Install pressure transmitters so that:
• there is sufficient overvoltage protection in the event of lightning or overvoltage.
• they are not in a pneumatic flow.
• excessive dust deposits (over 5 mm) and complete dust coverage are prevented.
• there is no danger from mechanical impact effects.
• the device is accessible for any necessary visual inspections and can be viewed from all sides.
• the nameplate is clearly visible.
• it can be operated from a location with secure footing.
CAUTION!
The manufacturer is not liable for any damage resulting from improper use or use other than the
intended purpose. This applies in particular to hazards due to insufficient corrosion resistance
and suitability of the materials in contact with product.
.book Page 12 Monday, July 7, 2014 3:31 PM