beautypg.com

Installation, 6 pre-installation requirements, 7 general requirements – KROHNE OPTIFLUX 1000 Quickstart EN User Manual

Page 7

background image

INSTALLATION

2

7

OPTIFLUX 1000

www.krohne.com

04/2014 - 4002298502 - QS OPTIFLUX 1000 R06 en

2.6 Pre-installation requirements

Make sure that you have all necessary tools available:

• Allen key (4 mm)
• Small screwdriver
• Wrench for cable glands
• Wrench for wall mounting bracket (remote version only)
• Torque wrench for installing flowmeter in pipeline

2.7 General requirements

2.7.1 Vibration

2.7.2 Magnetic field

INFORMATION!
The following precautions must be taken to ensure reliable installation.

Make sure that there is adequate space to the sides.

Protect the signal converter from direct sunlight and install a sun shade if necessary.

Signal converters installed in control cabinets require adequate cooling, e.g. by fan or heat
exchanger.

Do not expose the signal converter to intense vibration. The flowmeters are tested for a
vibration level in accordance with IEC 68-2-64.

Figure 2-3: Avoid vibrations

Figure 2-4: Avoid magnetic fields