beautypg.com

Main cover installation, Assembly instructions – Rhino Shelter SHED-12W X 12L X 8H User Manual

Page 6

background image

Assembly Instructions

Shed House Style 12 x 12 x 8


The rope channels should be located inside the unit, with
the frame members passing through the pre-cut slits in
the end panel/door. Replace and tighten the carriage
bolts after putting the end panel into position.

When putting on the doors, adjust the length to make
certain the doors do not drape onto the ground. Adjust
by pulling more or less material over end arch. If pulling
them up puts too much stress on the slit where it goes
over the wind brace, use a sharp knife to cut slit another
inch or two to relieve it. The PE fabric is rip-stop weave
and will only separate where cut.

Step 3. Tie off one end of the rope coming out of the
end panel to a turnbuckle. Turnbuckle should be
loosened all the way and the open hook end attached to
the hole in the inside of the end arch. Hold the end of
the unsecured rope and apply pressure downward with a
foot to remove excess. Re-adjust gathered material
evenly along door rope. This step is key to getting a
good door fit. Tie off the end off the rope to a second
turnbuckle attached to a hole in the foot of the end arch
on the opposite side. The end panel can be adjusted
further by tightening the turnbuckles.

Note: Adjust/Snug the end panel by turning the

turnbuckles or repeating step 3 on a regular basis

MAIN COVER INSTALLATION

Step 1. To elongate the life of Main Cover, put a small
square of duct tape (field supplied) over each bolt head


V2.2

Do NOT Return Assembly To Dealer or Store. For All Questions or Shortages Please Call MDM Products Directly

Customer Service 800-447-7079 or 203-877-7070

6