Nexo Alpha System User Manual
Page 11
α
α
α
P 11
USER MANUAL
VERSION :1.01
DATE : 06/10/10
2.2. F
LYING THE
S
YSTEM
Alpha Series loudspeakers are equipped with steel anchor plates that can be fitted with the corresponding
Fly Rails. The X-Bow flying system is supplied as an accessory. The X-Bow Flying Manual must be read
before flying the system.
The following points are designed to remind the user of safe practice when flying the X-Bow system. They
cannot address every possible circumstance in which the system might be deployed, therefore the user
must always apply his or her knowledge and experience. If in doubt, seek advice from your NEXO agent.
2.2.1. F
LOWN
S
YSTEMS
S
AFETY
• Always inspect all the X-Bow components and cabinet Fly Rails for damage before assembly. Pay
special attention to the lifting points, trombone sockets and safety clips. If you suspect that any of the
components are defective, DO NOT USE THE AFFECTED PARTS. Contact your supplier for
replacements.
• Read the X-Bow Flying manual carefully. Also, be familiar with the manuals and safe working
procedures for any ancillary equipment which will be used with the X-Bow.
• Ensure that all local and National regulations regarding the safety and operation of flying equipment are
understood and adhered to. Information on these regulations can usually be obtained from Local
Government Offices.
• When deploying the X-Bow system always wear protective head wear, footwear and eye protection.
• Do not allow inexperienced persons to handle X-Bow flying systems. Installation personnel should be
trained in loudspeaker flying techniques and should be fully conversant with this manual.
• Ensure that motor hoists, hoist control systems and ancillary rigging components are currently certified
as safe and that they pass a visual inspection prior to use.
• Ensure that public and personnel are not allowed to pass beneath the system during the installation
process. The work area should be isolated from public access.
• Never leave the system unattended during the installation process.
• Do not place any object, no matter how small or light, on top of the system during the installation
procedure. The object may fall when the system is flown and is likely to cause injury.
• Secondary safety steels must be installed once the system has been flown to the operating height.
Secondary steels must be fitted irrespective of the local safety standards applicable to the territory.
• Do not fly the system over areas to which the audience has access.
• Ensure that the system is secure and prevented from pivoting about the motor hoist. Avoid any form of
dynamic loading to the assembly.
• NEVER attach any item to the X-Bow other than the NEXO X-BOW accessories.
• When flying outdoor systems ensure that the system is not exposed to wind or snow loads and is
protected from rainfall.
• The X-BOW requires regular inspection and testing by a competent test centre. NEXO recommend that
the system is load tested and certified annually or more frequently if local regulations require.
• When de-rigging the system ensure that the same duty of care is given to the procedure as for the
installation. Pack X-BOW components carefully to prevent damage in transit.