Caution – Yokogawa ADMAG AXW User Manual
Page 16

<3. INSTALLATION>
3-7
IM 01E25D11-01EN
5. Install the flowtube into the customer’s pipe
with the gaskets A.
F0314.ai
Hang the grounding
ring up with this point.
Unfasten the bolts and
remove the grounding rings.
Cut out some holes on the
gasket B when necessary.
Wire
Grounding Ring
Flowtube
Screw & Nut : Connect the wire from the
grounding ring or the customer’s pipe.
Note : Gasket A and B should be placed concentrically with
the flowtube.
Figure 3.3.6 Mounting Procedure with Grounding
Rings GR1 for sizes 1100 mm (44 in.)
and above
Mounting Procedure (with optional
Grounding Rings GR2):
The grounding rings are installed and locked
onto the flowtube with gaskets B when shipped
from factory. Install the flowtube into the
customer’s pipe with gaskets A supplied by
customer.
(5) Tightening Nuts
Pass the bolts from pipe line side, not flowtube side,
and tighten the bolts according to the torque values
for the metal piping in Table 3.3.1 or 3.3.2
CAUTION
• Be sure to tighten the nuts according to the
prescribed toeque values. Tighten them
diagonally with the same torque values, step
by up to the prescribed torque value.