En g l is h english, Drain body installation – Pfister GT49-YP0Y User Manual
Page 4
E
N
G
L
IS
H
ENGLISH
ENGLISH
15
DRAIN BODY INSTALLATION
13
11
12
14
11 HOSE CONNECTION TO SPOUT BODY
From underneath sink, push the Center Connector (11A) onto Receiving Tube (11B),
until unable to push any further. Pull down on the quick connect housing (11A). If the
housing and the Inner Collet (11C) separate slightly but do not pull off the Receiving
Tube (11B), the connection is secure.
12 HOSE CONNECTION TO VALVE BODY
Slide the End Connectors (12A) with arrow (12D) pointing up onto the Valve Bodies
(12B). Push the End Connectors (12A) all the way up until completely seated. Be
careful not to damage O-Rings (12C). Place Clips (12E) onto End Bodies (12C) to
secure End Connectors (12A).
13 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (13A) to Faucet Inlets (13B). Hot water supply lines go
into left inlet. Cold water supply lines go into right inlet. (Supply lines not included).
Please follow manufacturer’s instructions when installing supply lines.
14 POP-UP INSTALLATION
Install and adjust Pop-Up (14A) using separate instructions supplied with the Pop-Up
assembly.
15 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
4
13B
11B
12C
14A
11A
11B
11A
11B
11A
11A
11C
12B
12E
12A
12E
12A
12D
12B
12C
12A
12B
12E
12D
13A
13A
13B
HOT
COLD