beautypg.com

En g l is h english, Drain body installation – Pfister GT49-YP0Y User Manual

Page 4

background image

E

N

G

L

IS

H

ENGLISH

ENGLISH

15

DRAIN BODY INSTALLATION

13

11

12

14

11 HOSE CONNECTION TO SPOUT BODY

From underneath sink, push the Center Connector (11A) onto Receiving Tube (11B),
until unable to push any further. Pull down on the quick connect housing (11A). If the
housing and the Inner Collet (11C) separate slightly but do not pull off the Receiving
Tube (11B), the connection is secure.

12 HOSE CONNECTION TO VALVE BODY

Slide the End Connectors (12A) with arrow (12D) pointing up onto the Valve Bodies
(12B). Push the End Connectors (12A) all the way up until completely seated. Be
careful not to damage O-Rings (12C). Place Clips (12E) onto End Bodies (12C) to
secure End Connectors (12A).

13 WATER SUPPLY CONNECTIONS

Connect water Supply Lines (13A) to Faucet Inlets (13B). Hot water supply lines go
into left inlet. Cold water supply lines go into right inlet. (Supply lines not included).
Please follow manufacturer’s instructions when installing supply lines.

14 POP-UP INSTALLATION

Install and adjust Pop-Up (14A) using separate instructions supplied with the Pop-Up
assembly.

15 UNIT START UP

Turn on hot and cold water supplies, and check for leaks above and below the sink.

4

13B

11B

12C

14A

11A

11B

11A

11B

11A

11A

11C

12B

12E

12A

12E

12A

12D

12B

12C

12A

12B

12E

12D

13A

13A

13B

HOT

COLD

This manual is related to the following products: