beautypg.com

En g l is h english, Drain body installation – Pfister T42-DF0C User Manual

Page 3

background image

E

N

G

L

IS

H

ENGLISH

ENGLISH

7

11

DRAIN BODY INSTALLATION

8

9

10

7 SECURING FAUCET

From underneath sink, secure Faucet Body (7A) by placing Metal Washer (7B) and
threading Long Nut (

7

/

16

Hex.) (7C) onto Mounting Post (7D). Make sure that the bumps

on Metal Washer (7B) are facing up. Firmly hand tighten Long Nut (7C). Secure Long
Nut (7C) not to exceed a

1

/

4

turn.

Caution: Do not over tighten!

8 WATER SUPPLY LINES

Gently separate hot and cold Supply Tubes (8A), approximately three inches apart.
Connect water Supply Lines (8C) to Faucet Inlets (8B). Hot water supply line goes to hot
inlet fi tting indicated by red tag (8D). (Supply lines not included). Follow manufacturer’s
instructions when installing supply lines.

9 POP-UP ROD CONNECTION

Insert Lift Rod (9A) into hole at the back of Faucet Body (9B).

10 POP-UP INSTALLATION

Install and adjust Pop-Up (10A) using separate instructions supplied with the Pop-Up
assembly.

11 UNIT START UP

Turn on hot and cold water supplies, and check for leaks above and below the sink.

3

HOT

COLD

7A

7B

7C

7D

8A

8B

8C

8A

8B

8C

10A

9A

9B

8D