beautypg.com

English – Pfister 8P8-CT1C User Manual

Page 4

background image

4

Thank you for purchasing this Price Pfister product. All Price

Pfister products are carefully engineered, and factory tested

to provide long trouble-free use under normal conditions.

This product is easy to install using basic tools and our easy

to follow illustrated instructions. If you have any questions

regarding this product, see info on previous page.
1 BEFORE PROCEEDING

WARNING: Read all the instructions completely before

proceeding. Price Pfister recommends calling a professional

if you are uncertain about installing this product!
This product should be installed in accordance with all local

and state plumbing and building codes.
2 SHUT OFF WATER SUPPLY

Locate water supply inlets and shut off the water supply

valves. These are usually found under the sink or near the

water meter. If you are replacing an existing faucet, remove

the old faucet from the sink and clean the mounting surface

thoroughly.
3 ASSEMBLY INSTRUCTIONS

If operating pressures exceed 5 BAR (~75 PSI), the use

of a pressure reducer is recommended. Before proceeding

with the assembling, we advise to clean the hot and cold

water tubes, in order to avoid build-up of dirt that could

compromise the functioning of the valve.

4 VALVE INSTALLATION (Fig.A)

For Center Hole (1) on plaster wall, use the edges from

Plaster Guard (2) to inscribe Cutting Edges (3). Cut Cen-

ter Hole (1) along inscribed lines, as shown. The Depth

is measured from center of Valve Body (4) to finished wall

surface (5) is 1 13/32" min. to 2 7/16" max. The Tub Spout

Hole (6) and Shower Outlet Holes (7) are to be 1 1/4”

diameter.
5 VALVE INSTALLATION (Fig.B&C)

Take out the Plastic Caps (1) with the help of a flat

screwdriver. Place the Valve Body (2) into the wall, with

the Shower Outlet (3) facing the up. Body inlets (4&5) and

outlets (3&8) are designed to accommodate 1/2-14 NPT

pipe. Connect the Hot Water Supply (4) to the Left Inlet

and the Cold Water Supply (5) to the Right Inlet. Connect

Shower (6) and Tub (7) Outlet Pipes to Valve Body (2).

Connect Pipe Elbows (9) (not included) to ends of both

pipes.
WARNING: When attaching threaded fittings, use

thread sealant or PTFE Plumber’s tape according to

manufacturer’s instructions.
CAUTION: When using iron pipes, it is not recommended

to reduce outlet pipe diameter.
CAUTION: For Copper Sweat joints, it is important

to remove Valve Cartridge and other Plastic Components

Supply

Suggested

Maximum

Minimum

Hot Water

Temperature

65 Cº (150ºF)

80 Cº (175ºF)

15 Cº (60ºF)

Operating

Pressure

3 BAR (44PSI)

5 BAR (73PSI)

0.5 BAR (7PSI)

1 1/4” DIA. Hole

1 1/4” DIA. Hole

1 13/32” to 2 7/16” Max

1

6

3

4

5

7

2

A

B

1

8

3

2

ENGLISH

This manual is related to the following products: