beautypg.com

En g li sh – Pfister 8P8-PHHK User Manual

Page 4

background image

EN

G

LI

SH

ENGLISH

13

15

16

17

12

14 UNIT START UP

Turn on hot and cold water supplies, and check all connections for leaks.

16 SHOWER HEAD INSTALLATION

Thread Hand Shower (16A) onto Hose (16B).

Make sure Hand Shower (16A) is securely tightened to Hose(16B).

15 FINAL FLUSHING

For final flushing, turn valve on and allow water to run through the Tub Spout

(15A) for several minutes. Pull Spout Knob (15B) up to allow water to run through

Shower Hose (15C). Allow water to run for several minutes until all foreign matter

clears the line.

13 TUB SPOUT FUNCTION

When the valve is turned on, water normally flows through the Tub Spout (13A).

To activate the shower, turn valve on and pull the Knob (13B) up. Hold on until

water flows continuously from the shower arm.

17 HAND SHOWER FUNCTION

To adjust spray, turn outer shell (17A) using switch (17B) to a desired spray

pattern.

12 VALVE FUNCTION

By rotating the Lever Handle (12A) slightly counterclockwise, the valve will

be fully activated to the “COLD” position. The water temperature can be

increased by continuing to rotate the Lever Handle (12A) in a counterclockwise

direction.

4

UP

For

Shower

13A

13B

15A

15B

15C

16A

16B

17A

FULL HOT

FULL COLD

CLOSED

OPEN

12A

17B

This manual is related to the following products: