REV 2 MCCB-250 USER’S MANUAL

10

3.0 OPERATING

PROCEDURES

3.1

Testing the Time Delay of a Protection Relay

Figure 3 illustrates a typical connection of the MCCB-250 to a protection relay to test its “Open
Time Delay”. The MCCB-250 injects a test current through a bus. The test current is sensed by
the CT of the protection relay. One of the relay dry contacts is used to stop the MCCB-250
timer.

Figure 3. Typical MCCB-250 Application