Vanguard TTRA-S2 (ATRT-03 S2, ATRT-03A S2, ATRT-03B S2, Tri-Phase) User Manual
Page 40

TTRA-S2 VERSION 1.x SOFTWARE MANUAL
REV 2
37
8. Click on the “OK” button. An untitled test plan with the selected parameters will be
created and displayed as shown below:
9. Enter the header information in the corresponding input fields.
10. If you had entered a number other than 0 for additional tests, enter the values for each
additional test row (H Voltage, X Voltage, H Tap, and X Tap). You can also modify any of
the H Voltage, H Tap, X Voltage, and X Tap values in the other rows by clicking on the
corresponding cell and entering the new value.
11. Select the LTC type from the “Type:” drop-down list. If applicable, select the group from
the “Group:” drop-down list.
12. Enter the maximum deviation percentage in the “Max Dev. %” input field.
13. Select the test voltage from the “Voltage:” drop-down list.
14. Save the test plan (see section 5.4).