Nbox(b)/cnc2 installation instructions - sheet 2, Installation - configuration, Check network – TREND NBOX(B)_CNC2 User Manual
Page 6: Check node controller, Close flap, Switch on, Set battery links on
2 - 2
NBOX(B)/CNC2 Communications Node Controller Installation Instructions TG200265 Issue 1/B 20/07/04
NBOX(B)/CNC2
Installation Instructions - Sheet 2
O
I
NBOX(B)/CNC2
?
NBOX(B)/CNC2
?
TX
RX
OK
DTRB
D T R A
CTSB
CTSA
0
I
Installation - Configuration
(continued)
T -
T +
R -
R +
L A N A
T -
T +
R -
R +
L A N A
TX
RX
OK
DTRB
D T R A
CTSB
CTSA
12
Check Network
(Lan A)
b
TX
a
RX
c
OK
✘
CNC2 faulty
Check network cabling for
short circuits with a
multimeter (NOT Megger)
Network Address invalid
0, 2, 3 or >119
OK
OK
NBOX(B)/CNC2
Check Node Controller
11
Check supply
CNC2 Faulty
b (watchdog)
a (power)
Close flap
10
Switch On
8
Check baud rate
Power up other nodes until
faulty node is found
(OK
). Correct fault.
(green)
(red)
(yellow)
(yellow)
(green)
a
b
Set Battery Links On
if NBOXB
9
TX
RX
OK
DTRB
D T R A
CTSB
CTSA
J1
3
J1
3
ON
OFF
ON
OFF
Note: Batteries must be charged for
16 hours before they will support
unit during mains failure