LA STEELCRAFT BBC-30Z User Manual
Steelcraft products, Sheet, Model elevation view
12"
SHEET
DATE: 10/25/05 DRAWN BY: AFS
DO NOT SCALE DRAWING
STEELCRAFT PRODUCTS
PHN 626-798-7401 FAX 626-798-1482
P.O. Box 90365 - Pasadena, CA 91103
MODEL
ELEVATION VIEW
Z-SHAPED
BBC-30Z
BALANCE BEAM
1 of 1
ASSEMBLY INSTRUCTIONS:
1. LAY BEAM ON THE GROUND AT THE INSTALLATION SITE AND MARK THE POSITIONS FOR THE
FOOTINGS. DIG SIX FOOTING HOLE 10" DIA. X 16" DEEP.
2. PLACE BEAM IN THE FOOTING HOLES WITH THE TOP OF BEAM AT 12" ABOVE FINISHED
GRADE. SUPPORT IN A LEVEL AND PLUMB POSITION.
3. POUR CONCRETE IN THE FOOTINGS TO A LEVEL OF 6" BELOW FINISHED GRADE. ALLOW
CONCRETE TO SET FOR 48 HOURS BEFORE REMOVING THE TEMPORARY BRACING.
FINISH GRADE
SURFACE
CONCRETE
FOOTING (TYP. OF 6)
10" DIA. X 16" DEEP
6" ATTENUATING
2-3/8" OD PIPE
SURFACE
30'-0"
(3) 1-3/8" X 3" X 10' STEEL CHANNEL
FINISHED IN ENAMEL WITH NON-SKID
PLAN VIEW