LA STEELCRAFT JCT-1011 User Manual
Steelcraft products, Model
26"
22"
60"
39 1/4"
39 1/4"
39 1/4"
82"
117 3/4"
LEVEL POSITION.
5. POUR CONCRETE IN FOOTINGS AND
WAIT AT LEAST 41 HOURS BEFORE USE.
ASSEMBLY
1. DIG NINE FOOTINGS AS SHOWN IN
PLAN VIEW. TOP OF FOOTINGS TO BE
AT LEAST 6" BELOW FINAL GRADE.
2. PLACE "SIDE" SECTIONS IN FOOTING
AND SUPPORT BOTTOM RUNG AT
12" ABOVE FINISHED GRADE.
3. PLACE HORIZ. LADDER, CHIN BARS
AND SLIDE POLES ON POSTS.
4. SUPPORT ASSEMBLY IN PLUMB AND
JCT-1011
JUNIOR TEAM
CLIMBER
14" DIA. X 30" DEEP
CONC. FOOTINGS (TYP. OF 9)
(SUPPLIED BY OTHERS)
NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE
PHN 626-798-7401 FAX 626-798-1482
DATE: 4/10/07
DRAWN BY: AFS
DO NOT SCALE DRAWING
STEELCRAFT PRODUCTS
P.O. Box 90365 - Pasadena, CA 91103
MODEL