PART 5 - INSTALLATION

A. INSTALLATION CHECKLIST

Location

Sufficient room to service water heater, piping, and related controls

Provisions made to protect area from water damage

Centrally located to fixtures

Protected from freezing temperatures

Area free of flammable and/or corrosive vapors


Potable Water Supply

All related piping free from leaks

Thermal expansion tank installed

Water heater and fixtures have been properly purged of air

ASSE 1017 rated thermostatic mixing valve IS REQUIRED PER SRCC OG-300

Have water supply tested and ensure it meets the requirements outlined in the Part 2, Section E of this manual


Relief Valve

Temperature and Pressure relief valve properly installed and discharge line runs to open drain

Discharge line not exposed to freezing temperatures

Discharge line constructed of copper


Wiring; SE models

Power supply voltage agrees with the water heater rating plate

Branch circuit wire fusing or circuit breaker properly sized

Electrical connections tight and unit properly grounded


Wiring; SB models

Water heater control is secure and in control well

Boiler backup control is wired to the boiler control or relay center


Solar Heat Exchanger to Solar Panel; SE and SB models

Anti-freeze is added and rated as non-toxic with copy of MSDS sheet for homeowner

Solar heat exchanger completely purged of air

Expansion tank and temperature and pressure gauge operating properly

Solar control shows circulators operating properly on the solar panels


Boiler Heat Exchanger; SB models only

Boiler heat exchanger completely purged of air

Expansion tank and temperature and pressure gauge operating properly

Boiler control shows circulators operating properly on the solar panels


Anti-Freeze Fluid

Solar water heaters with single wall heat exchangers: Make sure freeze protection fluids are certified non-toxic, FDA rated
GRAS

The use of glycol not recognized as GRAS is allowed in double wall heat exchanger models ONLY.

Glycol percentage must be calculated per local area freeze level

Provide glycol MSDS sheet to end user


NOTE: Make sure you have all necessary tools, materials and accessories before beginning work on the solar system.

TOOLS AND MATERIALS
Electric Drill

Torch and Striker

Drill Index (w/ ½”, ¾”, 1” and 1 ¼” Wood Bits)

Putty Knife

Hack Saw

High Temperature Joint Compound

Tubing Cutter

Wire Nuts or Connectors

Tin Snips

Miscellaneous Copper Pipe & Fittings (3/4”)

16’ Tape Measure

1” x ¾” Copper Sweat Couplings

24” Level

1” Copper Sweat Caps

Flashlight

Silicon Caulk and Roof Sealant

Extension Cord

Minimum ¾” I.D. Type M Copper Tubing

Slip Joint Pliers

Needle Nose Pliers

Pipe Wrenches, 10” and 14”

Angle Iron

Open End Wrenches, 9/16 & 7/16

Threaded Rod, Nuts, & Washers