SKC Limited Flite 2 Asbestos Sampling Mast instructions User Manual
Page 2

Page 2
007-09-015 Issue C September 2012
SKC Limited 11 Sunrise Park, Higher Shaftesbury Road, Blandford Forum, Dorset DT11 8ST United Kingdom
T: +44 (0) 1258 480188 F: +44 (0) 1258 480184 E: [email protected] W: www.skcltd.com
6. Prepare the cowled asbestos sampling head (225-54 or 225-54A) by unscrewing
the hosetail and removing the metal bracket and plastic sealing washer.
7. Screw the threaded hole on the
asbestos sampling head onto the male
thread at the top of the sampling mast.