Performance profi le, Operation – SKC 222-2301 Grab Air Sample Pump User Manual
Page 3
4
Performance Profi le
Flow Rate .............................................. Fixed 1 L/min
Operation Time ................................... Approx. 1000 liters volume per batt ery dependent on
batt ery quality
Batt ery .................................................... Disposable 9-volt alkaline
Pumping Action .................................. Diaphragm
Case ........................................................ Sturdy, lightweight plastic
Intrinsic Safety .................................... Not intended for use in hazardous locations
Protect sample pump from weather when in use outdoors.
Failure to follow warnings and cautions voids any warranty.
Operation
1. Check batt ery. If the low batt ery LED on the pump is lit, insert a fresh 9-volt
alkaline batt ery.
a. Remove four case screws and remove the pump faceplate.
b. Remove the old batt ery, insert the new batt ery, replace the faceplate, and
secure with case screws.
Before use, allow pump to equilibrate after moving it from one temperature
extreme to another.
2. Att ach PTFE tubing to the exhaust fi tt ing on the top of the pump. Att ach the
free end of the tubing to the inlet valve on the sample bag. See bag operating
instructions for details on operation of bag fi tt ing(s).
Grab Air bag sampling train
3. Slide the pump's On/Off switch to On.
Do not operate pump in hazardous locations.
Protect
sample
pump from
weather
when in use
outdoors.