D. Installation:
The Omnicell is fully assembled when shipped and ready for installation.
With the vessel, tank, or hopper supported safely on blocks, jacks or by
other means:
• Set each OMC assembly base onto a flat surface centered under
the support leg/support flange
• Loosely bolt the flange of the support legs to the OMCs' load
mounting plates
• Select the checking that best suits the application and rotate the
posts and/or mounting yokes for proper checking clearances
(there are many settings variations that can be used to get the
right checking clearances).
• Ensure the vessels load 'legs' are directly over the center of the
load cell's load mounting plate
• Mark the holes where the anchor bolts will be placed, or drill
down through the holes in the base
• Drill and set anchor bolts, then mount the base and secure, with
lock washers and nuts
• Wire the load cell into the junction box or sectional controller
or QMB using the color code listed above, or printed on the cable.
• Use the calibration sheet packed with each cell for Intalogix™
Technology instruments' exact settings of cell outputs.
• Carefully lower the vessel onto the cells ensuring that any one or
more cells are not overloaded during the process
• Use the proper manual for instrument calibration