beautypg.com

Fairbanks Aegis Heavy Capacity PLF-6200-HQ Series User Manual

Page 13

background image

load cells with wire markers or other means. Disconnect the load cells' wires from
the terminal blocks. Disconnect the home-run wires.

5. Remove the PCB, clean the box, then install the new PCB.
6. Reconnect all load cell and home-run wires to the new PCB
7. Tighten all gland bushing nuts

8. Replace the box cover and torque all screws to 18-20 in/lbs. Replace the platform

access cover .

9. Recalibrate as necessary.

& )

F

R

o

R

o

W

t

$

A

V

s

V

s

H

e

P

m

E

b

O

l

\

y

5

R

H

e

S

p

O

l

D

a

F

c

H

e

P

m

H

e

Q

n

W

t

:

1. Lift the platform end with a forklift or heavy pry bar using wood blocks for safety.
2. Loosen the lock nut and remove the old foot assembly.
3. Use anti-seize on the new foot threads and screw into the load cell.
4. Lower the scale to the surface removing the safety blocks.
5. Ensure that the weight is shared evenly by all four (4) feet then torque the lock nut

to 75 ft/lbs.

50637 / SJ4799

13

08/02 Issue 2

Note:
For analog systems, Leave the box cover OFF until all corner adjustments are completed.

This manual is related to the following products: