beautypg.com

Pillar installation steps – Fairbanks Aegis Xtreme-Duty Floor Scale User Manual

Page 22

background image

Section 4: Service & Maintenance

11/08

22

51206 Rev. 1

3.3.2. Pillar Installation Steps

1. To remove the Top Plate, loosen the

three (3)

one quarter inch (¼”) Allen Screws

.

2. Carefully run the Interface Cable into the bottom

Access Hole, up through the Pillar, and then
thread it out through the top Access Hole.
─ Allow extra cable slack to accommodate the

Instrument wiring.

3. Replace the Top Plate, then secure it into

position using the

one eighth inch (1/8”)

Allen Wrench

.

4. Install the Instrument Top Bracket, secure it with

the supplied hardware

5. Connect the Interface Cable to the Indicator.

─ Refer to the appropriate instrument service

manual for correct wiring information.