3. Installation Instructions

To insure an adequate supply of steam is provided, be sure that the steam lines and steam return lines are

sized and laid out as stipulated in this manual. Inadequate steam lines and steam return lines or improper

steam plumbing will result in poor performance and can cause component failure. Clean, dry steam must be

provided to the dryer.

IMPORTANT: Steam coil failure due to water hammer by wet steam will VOID THE WARRANTY.

a. The pressure of the condensate in the steam supply will cause water hammer and subsequent heat

exchanger (steam coil) failure. The steam supply connection into the main supply line must be made with

a minimum 10-inch riser. This will prevent any condensate from draining towards the dryer.

b. The steam supply piping to the dryer must include a 12-inch rise along with a drip trap and check valve.

This will prevent any condensate from entering the steam coil.

H. STEAM INFORMATION

It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the

steam plumbing installation is adequate and conforms with local and state regulations or codes.

IMPORTANT: Failure to comply with the requirements stipulated in this manual can result in

component failure which will VOID THE WARRANTY.

NOTE: The ADS-75 is manufactured with a pneumatic (piston) damper system which requires an

external supply of air (80 PSI +/- 10 PSI).

1. Steam Coil PH Level

The normal PH level for copper type steam coils must be maintained between a value of 8.5 to 9.5. For

steel type steam coils the PH level must be maintained between a value of 9.5 to 10.5. These limits are set

to limit the acid attack of the steam coils.

IMPORTANT: Coil failure due to improper PH level will VOID THE WARRANTY.

2. Steam Requirements - High Pressure

Inlet -------- 1" supply line connection -- qty. one (1) at top manifold

Return ----- 1" return line connection --- qty. one (1) at top manifold

2

3(5$7,1*

6

7($0

3

5(6685(

0D[LPXP

SVLJ

0LQLPXP

SVLJ

+HDW ,QSXW 1

PSH6GÃ

/

P69

%KS

&RQVXPSWLRQ $

QQSPYDH6U@

OEVKU

ÃÃHvv€ˆ€Ã‚ƒr…h‡vtÅr††ˆ…rГs‚…Г‚ƒ‡v€ˆ€Ãq…’vtÃÅr†ˆy‡†