Installation – Poweramp CentraAir AIR POWERED User Manual
Page 18
![background image](/manuals/343642/18/background.png)
16
4111-0034 —July 2012
Aug 2012
INSTALLATION
1.
Mount the push button control panel (B) so bottom
of control panel-to-dock floor distance (C) is 48 in.
(1219.2 mm).
2.
Install electrical disconnect panel (A) if not already
installed. (Disconnect panel can be a small snap
switch as current will be minimal.
3. Install and connect the control wiring.
4.
Re-install the air bellows, and connect air line.
5.
Connect the dock leveler power cable coil. Refer
to the electrical drawings supplied with the dock
leveler.
6.
After all electrical connections in the pit have
been made, raise the leveler, disengage the
maintenance prop and allow the platform to lower.
7. Install the Placard(s) (D), in close proximity to the
control box and in plain sight.
Install Control Panel and Wiring or Air Lines
A— Disconnect Panel
B— Control Panel
D— Placard
(Provided by others)
C— Distance, 48 in. (14 630 mm)
The electrical power must be OFF prior to electrical
installation. For maximum protection, use an OSHA
approved locking device to lock out all power
sources. Only the person installing the equipment
should have the key to unlock the power source.
Failure to follow these instructions may result in
serious personal injury or death.
DO NOT make any final electrical connections until
all welding has been completed. Failure to do this
may result in serious personal injury or death.
All electrical work — including the installation of
the disconnect panel, control panel, and final
connections to the pit junction box — must be
performed by a certified electrician and conform to
all local and applicable national codes.
B
A
C
D