Set-up
5.1
Initial set-up
The wall saw system is delivered ready for set-
up. All instructions in this chapter are equally
valid at the initial set-up.
5.2
Preparatory operations
Always proceed as follows:
•
Settle fundamental conditions
•
Secure the job site
•
Determine both position and sequence of
the cuts
•
Choose the saw blade first and then the
saw motor
•
Carry out visual inspections and mainten-
ance works
Prior to putting the system into operation, the
following steps are always to be observed:
Position of supply lines
Inform yourself about the position of supply li-
nes in walls and ceilings.
Water
Where does the flushing water of the wall saw
system drain off? Take appropriate precauti-
ons, if necessary.
Secure the job site
Secure the operating area of the wall saw sy-
stem. No access to unauthorized persons!
When cutting into walls, pay attention the
other side of the wall! Secure this area too!
Secure cutouts
Secure the cutouts of walls and especially of
ceilings by appropriate means, e.g. by a cra-
ne, supports etc. Consider the weight of con-
crete! (1m
3
weighs about 2,6 t)
Position of cuts
Inform yourself about the concrete to be cut.
–
Xur rГvГurГ rvs prr4Ã
–
DÃurÃpp rrÃurhvyà Ãyvtuyà rvs prq4Ã
–
DГvГvhiyrÃs ÃqryÃsvvt4
Determine both the position and the sequen-
ce of the cuts prior to starting operation. In
case of a door cutout, e.g. first carry out the
cut at the bottom, then the lateral cuts, and fi-
nally the cut on top.
If possible, cut in perpendicular direction
to the reinforcement.
Non-observance of the cutting sequence indi-
cated may lead to blocking the blade or to da-
mages to the system.
Length of tracks
Determine the track length for the cut to be
carried out. Allow for sufficient excess length
for the wall saw head.