beautypg.com

American Standard Moments T506.740 User Manual

Page 2

background image

M 9 6 8 0 2 6

1

2

INSTALL HANDLES

Should the hot and cold water supply pipes have been transposed making
adjustment impossible, proceed as follows:

TRANSPOSED SUPPLY PIPING

OR BACK TO BACK INSTALLATION

3

Remove check stops and re-install them transposed.

Shut off water supply.
Remove handle and rim.

(Reverse steps 1 and 2)

.

CHECK STOP

(RED TO BLUE)

Turn the water supply back on and perform the temperature adjustment in step 4.

Assemble HANDLES and TRIM.

CHECK STOP

(BLUE TO RED)

Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE
CHECK STOP is now on the left.

8

8

1

9

2

7

4

4a

3

Thread HANDLE SCREW (1) into VALVE STEM (2) and tighten
to secure KNOB MOUNT (3).

Align HANDLE (4) and push onto KNOB MOUNT (3).

Tighten SET SCREW (5) in handle with HEX WRENCH (6) SUPPLIED.

Install HANDLE ADAPTER (7) onto TEMPERATURE CONTROL KNOB (8)

and tighten with SCREW (9).

Align HANDLE (4a) and push onto TEMPERATURE CONTROL KNOB (8).

Tighten SET SCREW (5a) in handle with HEX WRENCH (6) SUPPLIED.

5a

6

5

TOP

1

Remove PLASTER GUARD (1) if attached.

Push CAPS (2 & 2a) as shown onto CONTROL
VALVES (3).

Push ESCUTCHEON HOLDER (4) with lightly greased
O-RING SEALS (5) over CAPS (2, 2a).

Attach the FIXATION PLATE (7) to the ESCUTCHEON
HOLDER (4) with the two SCREWS (6) provided.

Push ESCUTCHEON (8) flush against finished wall.

1

TRIM INSTALLATION

2

2a

1

4

5

6

3

7