Magnum Venus Plastech PATRIOT PAT-CP-3000-ADH User Manual
Page 19

Patriot Metering Pump Manual PAT-CP-3000
Rev. 08/2013
Page | 19
8.
Install Ball (9201-1-14) and Ball Cage (PAT-CP-3009) into Inlet Body (PAT-CP-
3002).
9.
Screw Outlet Body (PAT-CP-3003) into Inlet Body (PAT-CP-3002) until it bottoms
out. If the inlet and outlet hose fittings are not in proper position to attach to
metering pump drive, back the outlet body out before bring the lock nut down and
tightening against the inlet body. If not sure, complete assembly and attach to
drive before tightening the lock nut.
10. Install O-ring (O-S-013) onto the Inlet fitting and O-ring (O-S-013) on to the outlet
fitting. Install both fittings and snug.
11. Install the Ball Joint onto the top end of the Fluid Rod (PAT-CP-3008).
Note: Use a small amount of removable thread lock on the threads of the Fluid
Rod. Do not over tighten as the threads are small and can become damaged
easily. Allow the thread lock to dry thoroughly before putting the pump into
service
12. Install the metering pump back onto the drive. Orient the Outlet Body so hoses
do not interfere with the drive. Bring the Lock Nut (PAT-CP-3018) down onto the
Inlet Body (PAT-CP-3002) and tighten.
13. Attach all fluid hoses.