Before starting your project – Hellwig Air 6113 User Manual
Page 2
BEFORE STARTING YOUR PROJECT
WHEN LIFTING A VEHICLE WITH A JACK, BE SURE TO SET THE PARKING BRAKE AND USE
SAFETY STANDS.
ENSURE THAT THE INSTALLATION OF COMPONENTS WILL NOT CRUSH OR DAMAGE
FUEL AND BRAKE LINES OR ELECTRICAL HARNESSES.
BEFORE DRILLING ANY HOLES, ENSURE THAT ALL ELECTRICAL WIRES, FUEL LINES,
BRAKE LINES, BRAKE HOSES AND ANY OTHER COMPONENTS ARE MOVED OR
PROTECTED TO AVOID DAMAGE FROM DRILLING ANY HOLES .
DO NOT ATTEMPT ANY MODIFICATIONS TO THE VEHICLE OTHER THAN THOSE
OUTLINED IN THIS INSTRUCTION SHEET. IF ANY INTERFERENCE WITH THE GAS TANK,
FUEL LINES, BRAKE LINES, EXHAUST PIPE, ETC. EXISTS, STOP YOUR INSTALLATION AND
CALL HELLWIG PRODUCTS FOR TECHNICAL HELP.
IF WHEELS ARE REMOVED FOR INSTALLATION OF KIT, CHECK MANUFACTURERS
SPECIFICATIONS FOR PROPER LUG NUT TORQUE BEFORE REINSTALLING WHEELS.
WHEN CUTTING AIR BRAKE TUBING, A SQUARE CUT IS REQUIRED AND THE HOSE END
MUST NOT BE DEFORMED OR LEAKAGE MAY RESULT.
559-734-7451 800-367-5480 FAX 559-734-7460
1. Park vehicle securely and set parking brake and chock wheels. Jack up
frame of vehicle to allow clearance to install air spring assembly. Rest
frame of vehicle on jack stands before working on or under vehicle.
3. Install fitting in port of air spring. Torque fitting to approximately 20 ft-lb.
2. Remove factory bump stops from vehicle by
removing nuts from studs using a 15mm wrench
or socket.
6113 ( R-6113)
03/01/12