beautypg.com

Global Specialties 4005 - Manual User Manual

Page 9

background image

9

2. INSTALLATION


2-1. Initial Inspection

This instrument was carefully inspected both mechanically and electrically before shipment. It should
be physically free of damage. To confirm this, the instrument should be inspected for physical
damage in transit. Also, check that supplied accessories are present and correct.

2-2. Connecting AC Power

This instrument requires 115V AC or 230V AC (50-60 Hz) power socket with protective earth contact
(PE-contact).

CAUTION

AC POWER OF THIS INSTRUMENT IS PRESET TO 115V IN FACTORY. BEFORE POWERING
ON THIS INSTRUMENT, CHECK AND MAKE SURE THE VOLTAGE OF THE POWER SOURCE IS
SAME WITH THE MARKING OF UNIT
.

FOR USE WITH AC230V, THE VOLTAGE SELECTOR (on rear panel) SHOULD BE SWITCHED
TO THE 230V POSITION.


2-3. Cooling and Ventilation
No special cooling and ventilation is required. However, the instrument should be operated where the
ambient temperature is maintained.

2-4. Position
This instrument is built as a bench-type instrument with rubber feet and tilt stand in place. Stand-up
angle can be adjusted by rotating angle of carrying handle.

2-5. WARM-UP
Allow 30 minutes for the unit to warm up so that it is stabilized and ready for use.