Lifting the load, Operation, Opera t ion – Alamo 6212 User Manual
Page 66
![background image](/manuals/32953/66/background.png)
OPERATION
6212 01/11
Operation Section 4-26
© 2011 Alamo Group Inc.
OPERA
T
ION
A level bucket throughout the lifting cycle resists
bucket lift and increases breakaway effort.
NOTE: Do not be concerned if the bucket is not
completely filled during each pass. Maximum
productivity is determined by the amount of material
loaded in a given period of time. Time is lost if two
or more attempts are made to fill the bucket on
each pass.
LIFTING THE LOAD
When lifting the load, keep the bucket positioned to
avoid spillage. Loader has mechanical self leveling
of attachment in both raise and lower cycle.
Attachment can be adjusted by using bucket
cylinders.
See also other documents in the category Alamo Gardening equipment:
- 02986941P (99 pages)
- Machete T 7740 (90 pages)
- Switchblade Sickle Bar 6 (112 pages)
- FALCON 15/10 (156 pages)
- AXTREME2 02988075P (174 pages)
- Brahma 02968822P (64 pages)
- JD-5205 (104 pages)
- RX72 (52 pages)
- MACHETE 02968915C (174 pages)
- none (150 pages)
- 00756179P (70 pages)
- Lawn Mower (70 pages)
- Maverick Boom Arm Mower (174 pages)
- 803213C (140 pages)
- A-Boom (226 pages)
- 02979718C (110 pages)
- 272 (136 pages)
- A84B (148 pages)
- RHINO 2409 (106 pages)
- SHD96 (140 pages)
- 7191852C (110 pages)
- SAMURAI 02986950P (104 pages)
- 800 (58 pages)
- FC-0002 (122 pages)
- A60 (138 pages)
- ST10 (74 pages)
- Exten-A-Kut II (142 pages)
- RHINO 7214 MSL (44 pages)
- RHINO 95C (56 pages)
- A72B (138 pages)
- 803350C (168 pages)
- Interstater 803213C (186 pages)
- 4211 MSL (104 pages)
- Eagle 14 (186 pages)
- RHINO FX21 (156 pages)
- TS-135A (72 pages)
- TS-100A (154 pages)
- 02968915P (170 pages)
- Axtreme 02983326P (116 pages)
- RX96 (172 pages)
- 00761808C (170 pages)
- Axtreme 02984405 (106 pages)
- Swingtrim (126 pages)
- Axtreme FC-P-0002 (114 pages)