Ddlfu/ddlfmu, Ebara submersible sewage pumps, Instruction manual – EBARA DDLFMU User Manual
Page 5: Installation 3. electrical wiring, Warning

Ebara Submersible Sewage Pumps
DDLFU/DDLFMU
Instruction Manual
Ebara
Fluid Handling
www.pumpsebara.com
5
(803) 327-5005 • (803) 327-5097
(fax)
rev. 10/11
Installation
3. Electrical Wiring:
(1) Wiring
a) Wire as indicated for the appropriate start system as shown in Fig. 2.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.
output 15 to 30HP
208/230V
460V
warning
Check that the power is locked off and disconnected before working on pump. all electrical work should be
performed by a qualified electrician and all national and local electrical codes must be observed.
G – GRN
L
1
– RED – T
1
– T
7
– T
6
– T
12
L
2
– WHT – T
4
– T
8
– T
2
– T
10
L
3
– BLK – T
3
– T
9
– T
5
– T
11
P
1
– RED
P
2
– WHT
P
3
– BLK
P
4
– ORG
G – GRN
G – GRN
L
1
– RED – T
1
– T
12
L
2
– WHT – T
2
– T
10
L
3
– BLK – T
3
– T
11
T
4
– T
7
T
5
– T
8
T
6
– T
9
P
1
– RED
P
2
– WHT
P
3
– BLK
P
4
– ORG
G – GRN