AAON HB-005 User Manual
Page 22
![background image](/manuals/326849/22/background.png)
22
Run piping through utility entry in front of unit,
or through entry in floor of unit located next to
the compressor. Then run piping through
sidewall into heating cabinet.
Remember to seal around all exterior cabinet
penetrations at utility entries.
Gas valve installed at factory.
Piping to gas valve inlet must
be completed in field.
Valve Inlet
Bottom or Side Utility
Entry Options
Sidewall
Entry
Piping assembly ready to connect to field
supplied gas line.
Gas Valve
Figure 22a, Gas Piping