beautypg.com

CHIEF PDR Series User Manual

Page 8

background image

PDR Series

Installation Instructions

8

Figure 7

x 4

cable clamps

(J)

1

2

Cable Management

WARNING:

IMPROPER INSTALLATION CAN LEAD TO

SERIOUS PERSONAL INJURY OR DAMAGE TO
EQUIPMENT! Make sure cables do not run through pinch
points.

1.

Loosen front and rear cable clamps on top arm.
(See Figure 7)

2.

Thread cable ties (J) under cable clamps and secure clamps
to top arm. (See Figure 7)

3.

Route power/audio/video cables through the cable channel
in top arm (See Figure 7), allowing sufficient slack in cables
for left/Right movement of display and swing arm and also
swing arm extension and retraction.

4.

Secure cables to top arm using two cable ties (J).

5.

Repeat Steps 1 through 4, as necessary, for remaining top
arm and lower arms.

WARNING:

IMPROPER INSTALLATION CAN LEAD TO

SERIOUS PERSONAL INJURY OR DAMAGE TO
EQUIPMENT! DO NOT route cables through holes in
faceplate.

Tension Adjustments

Vertical Tilt Tension Adjustment

1.

With display mounted, check for desired vertical tilt tension.

2.

Adjust the Centris Select knob until desired vertical tilt

tension is obtained. (See Figure 8)

3.

To lock the mount at the desired vertical tilt, tighten the
vertical tilt lock screw. (See Figure 9)

Figure 8

Figure 9

Centris Select

Adjustment Knob

Vertical Tilt
Lock Screw