Installation - assembly – KOSPEL EPJ.P-PRIMUS User Manual
Page 16
16
Installation - Assembly
1. Fix the mixer on water supply pipe.
2. Undo the two screws and take the
front case off.
3. Connect the mixer by the use of metal
pipes with the heater in order to mark
the fixing points for the screws.
4. Drill holes at the marked places,
insert the screws in there.
5. Insert electric wires into the heater
through the stuffing box.
6. Install the heater onto the wall.
7. Connect the mixer and the shower
set with the heater.
8. Connect electric supplies.
9. Fix the front case and screw it up.
10. Install the shower holder.
11. Let the mains water pressure to get
to the mixer.
12. Check connections for leaks.
13. Vent the installation.
14. Switch electric supplies on (fuses).
Electric installation should be
equipped with residual current protec-
tive devices and other solutions which
will ensure disconnecting the heater
from the source of power (intervals
between all their poles should not be
less than 3 mm).
EPJ.P
EPJ.P...u