beautypg.com

Total power solutions, Network cable connection procedure, Battery connection procedure – Alpha Technologies FlexNet MPS48-12M - Quick Start Guide User Manual

Page 2: Network connections, Start-up and operation

background image

For more information visit www.alpha.com

United States

Bellingham, Washington Tel: 360 647 2360 Fax: 360 671 4936

Canada

Burnaby, British Columbia Tel: 604 430 1476 Fax: 604 430 8908

2 of 2

Total Power Solutions

Alpha Technologies reserves the right to make changes to the products and information contained in this document without notice.
Copyright © 2007 Alpha Technologies. All Rights Reserved. Alpha

®

is a registered trademark of Alpha Technologies. member of The Alpha Group™ is a trademark of Alpha Technologies.

021-514-B1-001, Rev. A (09/2007)

member of The

Group

TM

Network Cable Connection Procedure:

1. Remove the white seal from the 3-hole strain relief fi tting. Install the base of the fi tting into the 3/4" knockout and secure the top

inside nut.

2. Route the network interface cable (large connector fi rst), through the outer nut, the base, and into the enclosure.

3. Route the Ethernet cable and auxiliary wiring (if applicable) from inside the enclosure, down through the strain relief fi tting.

4. Insert the cables into the seal, leaving about 20" from end routed into the enclosure. The seal is split in three places to

accommodate the cabling.

5. Replace the seal into the base. Secure the outer nut, and tighten snug.

6. Connect the mesh cable connectors to the RADIO, POWER and RADIO, SERIAL connectors. Connect Ethernet cable to the

ETHERNET BACKHAUL connector. Installation may vary depending upon application.

7. Plug any unused ports in the seal (use a short section of wire, or other available material).

Mesh Interface Cable (optional)

3-hole Strain Relief Fitting

Network Interface Cable Installed

Battery Connection Procedure:

1. Loosen the retaining screw on the battery retaining brackets and move the bracket clear

of the battery shelf.

2. If using the cold weather kit option, see the technical manual for instructions on installing

the heater mats and insulating battery box.

3. Place two 12Ah batteries on each battery shelf. Tape the battery temperature probe to

the side of a battery between the two batteries on the top shelf.

4. Replace the battery retaining brackets and secure.

5. Connect the batteries, leaving the far left negative terminal disconnected. The positive

battery connections are fi tted with a safety tab to prevent misconnection.

Network Connections:

Connect the mesh router. Complete AC wiring (if applicable). Complete user-equipment
connections, e.g. ethernet backhaul.

Start-up and Operation:

1. Verify the input voltage select switch on the power module is set for the correct input

voltage.

2. Verify user-end connections, and apply AC power to the unit.

3. Connect the remaining battery terminal.

The green status LED should be ON solid after the battery connection is made.

Operating status is indicated by two status LEDs located on the power module.
See table (right) to determine operational status, and possible faults.

Tape Temp. Probe to Battery

LED Color

State

Indication

Green

Solid

Output OK

Green

Blinking

Standby Operation

Red

Blinking

Battery Low/Missing

Red

Solid

Replace Battery

Red & Green

Blinking

Overload

Base

Seal

Outer Nut

Splits indicated by

dashed lines

To MPS48-12

To

Radio