Gorman-Rupp Pumps SM4G1-X30 460/3 1002211 thru 1241783 User Manual
Page 17
OM−04461
CONTROL BOXES
TROUBLESHOOTING
PAGE D − 2
ELECTRICAL TESTING
Be certain to refer to the wiring diagram(s)
in the Installation Section of this manual be-
fore reconnecting any electrical compo-
nents which have been disconnected.
Test Equipment
A volt/amp/ohmmeter and megohmeter of ade-
quate range and quality will be required to conduct
the electrical tests. The suggested equipment indi-
cated below is commercially available, or an equiv-
alent substitute may be used.
Equipment
Use
Ammeter/
Voltmeter
To check AC Voltage
and current (amperage)
Ohmmeter
To measure resistance
(ohms) to ground
Voltage Imbalance
Each phase of the incoming three-phase power
must be balanced with the other two as accurately
as a commercial voltmeter will read. If the phases
are out of balance, contact your power company
and request that they correct the condition.
- SM4G1-X30 575/3 1002211 thru 1241783 SM4J1-X60 460/3 1004954 thru 1241784 SM4D18-X10 460/3 All serial numbers SM2E1-X3.5 460/3 All serial numbers Control Box SM2E1-X3.5 575/3 All serial numbers Control Box SM2E18-X3.5 460/3 All serial numbers Control Box SM2E18-X3.5 575/3 All serial numbers Control Box SM2E65-X3.5 460/3 All serial numbers Control Box SM2E65-X3.5 575/3 All serial numbers Control Box SM2F1-X1 460/3 All serial numbers Control Box SM2F1-X1 575/3 All serial numbers Control Box SM3B1-X6 460/3 All serial numbers Control Box