beautypg.com

Installation, Step 1 - preparation, Warning – Xylem MM 415C Replacement Head Mechanism 150E HD User Manual

Page 4: Caution

background image

4

A

B

C

D

c. Remove the existing head mechanism (C)

from the body (D).

a. Drain water in the boiler to a level

which is below the float chamber (A).
Allow the boiler to cool to 80˚F
(27˚C) and release the boiler pres-
sure to 0 psi (0 bar).

b. Using a flatblade screwdriver, remove the

junction box cover (B). Disconnect, mark,
and remove the supply wires and conduit
connections.

F

E

d. Using a scraper, remove the old gasket (E).

Clean all debris from the float chamber. The
gasket sealing surface (F) must be smooth
and clean.

STEP 1 - Preparation

INSTALLATION –

TOOLS NEEDED:
One (1) pipe wrench, one (1) flatblade screwdriver, one (1) scraper, and one (1) 9/16" socket or wrench.

• To prevent serious burns, the boiler must be cooled to 80˚F (27˚C) and the pressure must be 0 psi (0 bar)

before servicing.

• To prevent electrical shock, turn off the electrical power before disconnecting or making electrical connections.

Failure to follow this warning could cause property damage, personal injury or death.

!

WARNING

There may be more than one source of
power to the control.

!

CAUTION

A

B

C

D