Commissioning, measuring, calibration – YSI 4010-2 pH Adapter DIN / BNC User Manual
Page 4
General information
4010-2/3 pH Adapter DIN / 4010-2/3 pH Adapter BNC
4
ba76144e01
02/2013
Commissioning, measuring, calibration
Commissioning
Example
4010-3 with
mounted 4010-2/3
pH Adapter DIN
Note
The further commissioning steps are given in the operating manual of the pH
electrode.
All further details are given in the operating manuals of the pH electrode and
meter.
1
Unscrew the 4 screws of the cover plate (the screw driver is included
in the scope of delivery).
2
Insert the 4010-2/3 pH Adapter in the open mounting slot.
3
Attach the adapter to the meter with the 4 screws.
1 pH electrode
2 Reference electrode
3 Temperature sensor (NTC 30)
4
Connect the electrode to the socket of the adapter.
5
Calibrate the electrode according to the operating manual of the me-
ter.
1
2 3