Earth (ground) connections, Pump package location guidelines, Foundation requirements – Xylem AquaBoost CS and VS Pumping Packages User Manual
Page 27
Earth (ground) connections
WARNING:
Electrical shock hazard. Conduit grounds are not adequate. You must attach a separate
earth (ground) wire to the earth (ground) lug provided in the enclosure in order to avoid
potential safety hazards. Failure to follow these instructions can result in serious personal
injury, death, or property damage.
A grounding terminal is provided for a dedicated earth (ground) wire connection. You
must follow all provisions of the National Electrical Code and local codes.
Pump package location guidelines
WARNING:
Assembled units and their components are heavy. Failure to properly lift and support this
equipment can result in serious physical injury and/or equipment damage. Lift equipment
only at the specifically identified lifting points. Lifting devices such as eyebolts, slings, and
spreaders must be rated, selected, and used for the entire load being lifted.
Guideline
Explanation/comment
Make sure that the space around the pump package is
sufficient.
This facilitates ventilation, inspection, maintenance, and
service.
If you require lifting equipment such as a hoist or tackle,
make sure that there is enough space above the pump
package.
This makes it easier to properly use the lifting equipment
and safely remove and relocate the components to a safe
location.
Protect the unit from weather and water damage due to
rain, flooding, and freezing temperatures.
This is applicable if nothing else is specified.
Do not install and operate the equipment in closed
systems unless the system is constructed with properly-
sized safety and control devices.
Acceptable devices:
• Pressure relief valves
• Compression tanks
• Pressure controls
• Temperature controls
• Flow controls
If the system does not include these devices, consult the
engineer or architect in charge before you operate the
pump.
Take into consideration the occurrence of abnormal noise
and vibration.
The best pump location for noise and vibration
absorption is on a concrete floor with subsoil underneath.
Foundation requirements
Requirements
• The foundation must be able to absorb any type of vibration and form a permanent,
rigid support for the unit.
• The foundation must weigh at least 2-1/2 times the weight of the pump unit.
• Provide a flat, substantial concrete foundation in order to prevent strain and distortion
when you tighten the foundation bolts.
• Sleeve-type and J-type foundation bolts are most commonly used. Both designs allow
movement for the final bolt adjustment.
• Tie the concrete pad in with the finished floor.
Installation
AquaBoost CS and VS Pumping Packages Installation, Operation, and Maintenance Manual
25