beautypg.com

5c 5a 5b – Asus PCH-DL User Manual

Page 28

background image

2-10

Chapter 2: Hardware information

5. Secure the heatsink with the

retention clips.

a. Insert the center hole of a

retention clip into the center tab
on the retention mechanism.

b. Slightly move the clip to the right

so that the center tab is
positioned on the narrow side of
the hole. This ensures that the
side holes fit on the side tabs.

c. Press one end of the clip to snap

its hole on the right side tab.

Retention clip

d. Press the other end of the clip to

snap its hole on the left side tab.
This secures one side of the
heatsink.

6. Follow step 5 to install the other retention clip, and completely secure

the heatsink.

5c

5a

5b

Center tab position when
retention clip is in place

5d