Neutrik NPP-TB PATCH PANEL “Easy Patch” | 48 TB Jack User Manual
Page 8
Page 8 of 11
NPP-TB Instruction Manual
6. Lettering strip
Between the top and the bottom connector row is located the lettering strip.
To write on the paper strip lift the strip with your fingernail at the indentation on the left and
right respectively of the Easy Patch and pull it out. Separate the paper and the Plexiglas,
write the identification on the paper and insert it into panel from outside end to the center.