beautypg.com

Installation in existing tanks, Chapter 4 installation in existing tanks, Apter 4 – Grain Systems Bin Accessories PNEG-1753 User Manual

Page 13: For inst

background image

PNEG-1753 Fall Restraint Reinforcement Kit

13

4. Installation in Existing Tanks

This section is for the installation of the Fall Restraint Reinforcement Kit to be retrofit in existing tanks only.
See Chapter 3

on Page 7

for installing in newly constructed tanks.

105'-25K Roof Fall Restraint Reinforcement Installation Instructions
for CRP-6948

The center collar, all of the roof beam stiffeners and one eave tension plate will need to be drilled to allow
for the assembly of this reinforcement kit.

1. Use CRP-6943 as a template to locate and drill four (4) 7/16" holes and one 9/16" hole in every roof

beam stiffener as shown in

Figure 4A

. Drill one 11/16" hole in only one roof beam stiffener at the

termination point.

Figure 4A