beautypg.com

Electric motor drive – Grain Systems Unload Augers PNEG-1079 User Manual

Page 14

background image

4. Assembly Instructions

14

PNEG-1079 6", 8" and 10" Vertical Bin Unload Auger

Electric Motor Drive

1. Assemble a 3/4" nut onto threaded adjustment rod. Then thread adjustment rod into the 3/4" nut that

is welded onto the sleeve of vertical.

(See Figure 4C.)

Figure 4C 6" and 8" Vertical

2. Slide motor mount plate onto pivot rod weldment of vertical. Install cotter pin to hold motor mount

plate place.

3. Attach belt guard to belt guard mounting brackets with four (4) 3/8" x 3/4" long HHCS and nylon

lock nuts.

4. 6" and 8": Attach hinged side chain guard to vertical with two (2) 5/16" x 3/4" long HHCS,

flat washers and nylon lock nuts. Hold chain guard closed by using a 5/16" flat washer and
wing nut.

(See Figure 4C.)

10": Attach hinged side chain guard to vertical with two (2) 5/16" x 3/4" long HHCS, flat washers and
nylock nuts. Hold chain guard closed by attaching it to the lower chain guard using a 5/16" nylock nut.

(See Figure 4D on Page 15.)