Bin Stairs and Platform Assembly

Bin Stairs and Platform Assembly

Bin Stairs and Platform Assembly

Bin Stairs and Platform Assembly

Bin Stairs and Platform Assembly

LDR-4092
Wall Bracket

(I) LDR-4082
Stair Wall Bracket

LDR-4142
Diagonal Support Angle

(III) LDR-4084
Knee Brace

(II)LDR-4083
Horizontal Bar
Bracket

Stair - Top Section Assembly

Stair - Top Section Assembly

Stair - Top Section Assembly

Stair - Top Section Assembly

Stair - Top Section Assembly

I. The stair wall bracket (LDR-4082) should be

placed on a horizontal seam and bolted vertically.
The vertical location must be field drilled to match
up with platform location. Use 5/16” x 1 1/4”
bolt to secure LDR-4082 to the sidewall. Field
drill 3 more holes and attach the bracket.

II. Using the two end holes of horizontal step bracket

attach it to LDR-4082 with (2) 3/8” x 1”flanged
head bolts and nuts.

III. Using the same bolts and nuts as step II connect

the knee brace (LDR-4084) to LDR-4083 and
LDR-4082.

IV. Continue to raise bin adding sidewall sheets until

the top hole of the next sidewall bracket can be
attached to a horizontal seam. Each step will
cover 9 3/8” on the horizontal seam. Two steps

will be added before the next brace assembly can
be mounted. There should be a distance of 18 3/
4” along the horizontal seam between brackets.
Fasten the lower end of the bracket to the seam
with a seam bolt. You will need to field drill
extra holes (2) as needed to finish fastening
the bracket to the seam. (Use 5/16” x 1 1/4”
Bin Bolts).

V. Complete the second wall support assembly as

previously instructed in step II and III

Stair - Top Section Assembly

Figure 6: Stair - Top Section Assembly