Grain Systems Bin Accessories PNEG-780 User Manual
Page 7
7
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
LDR-4092
Wall Bracket
(I) LDR-4082
Stair Wall Bracket
LDR-4142
Diagonal Support Angle
(III) LDR-4084
Knee Brace
(II)LDR-4083
Horizontal Bar
Bracket
Stair - Top Section Assembly
Stair - Top Section Assembly
Stair - Top Section Assembly
Stair - Top Section Assembly
Stair - Top Section Assembly
I. The stair wall bracket (LDR-4082) should be
placed on a horizontal seam and bolted vertically.
The vertical location must be field drilled to match
up with platform location. Use 5/16” x 1 1/4”
bolt to secure LDR-4082 to the sidewall. Field
drill 3 more holes and attach the bracket.
II. Using the two end holes of horizontal step bracket
attach it to LDR-4082 with (2) 3/8” x 1”flanged
head bolts and nuts.
III. Using the same bolts and nuts as step II connect
the knee brace (LDR-4084) to LDR-4083 and
LDR-4082.
IV. Continue to raise bin adding sidewall sheets until
the top hole of the next sidewall bracket can be
attached to a horizontal seam. Each step will
cover 9 3/8” on the horizontal seam. Two steps
will be added before the next brace assembly can
be mounted. There should be a distance of 18 3/
4” along the horizontal seam between brackets.
Fasten the lower end of the bracket to the seam
with a seam bolt. You will need to field drill
extra holes (2) as needed to finish fastening
the bracket to the seam. (Use 5/16” x 1 1/4”
Bin Bolts).
V. Complete the second wall support assembly as
previously instructed in step II and III
Stair - Top Section Assembly
Figure 6: Stair - Top Section Assembly