Platform assembly – Grain Systems Bin Accessories PNEG-780 User Manual
Page 6
6
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Platform Assembly
Platform Assembly
Platform Assembly
Platform Assembly
Platform Assembly
Platform Assembly
When attaching the sidewall access platform to the
tank wall, vertical wall brackets need to be mounted
to the bin wall with 5/16” x 3/4” bin bolts (see Fig.
3). To insure the proper placement of the second
wall bracket, preassemble platform support (see Fig.
4) and mark the hole positions for drilling. Field drill
and assemble the platform support with 5/16” truss
head bolts. Now, proceed to the platform floor and
floor splice. Align holes on platform floor with the
holes on platform supports and bolt together using
5/16” x 3/4” truss head bolts and nuts. Be sure and
attach platform toe plate at the same time you attach
the platform floor (see Fig.6).
TDP-5005 (Lt Blue/Black)
Floor Brace (3)
LS-6623 (2)
Platform Support
Diagonal Support Angle (2)
LDR-4142
Figure 3: Wall Brackets to Bin Wall.
Figure 4: Platform Support Assembly
(2) Wall Bracket
LDR-4092
TDP-5002 (Pink/Black)
30” Hand Rail
TDP-5000 (Brown)
59” Hand Rail
TDP-5011
Platform
Toe Plate
TDP-5010 Platform
Splice Plate
TDP-5006
Platform Floor
Figure 5: Platform Assembly