Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Bin Stairs and Platform Assembly
Positioning Stair & Platform
Positioning Stair & Platform
Positioning Stair & Platform
Positioning Stair & Platform
Positioning Stair & Platform
Rings
Spaces
4
14
5
18
6
22
7
26
8
30
9
34
10
38
11
42
12
46
Positioning Stairs & Platform
Position the roof ladder and manhole
to allow for platform placement.
Refer to the table on this page to de-
termine where stairs will end. Posi-
tion the end of the stairs to avoid au-
gers, doors, fans, and control boxes.
Spaces around Bin
4.00” Corrugation
Note: Stairs may be assembled in either a clockwise or counter
clockwise direction around the Bin. However, clockwise is
recommended.
Figure 1: Orientation of Platform in relation to the manhole & roof
ladder.
2”
Firgure 2: Bracket Distance from Step Bracket.
Once you determine the platform lo-
cation, position the platform wall
bracket 2” from the horizontal seam
bolt where the stairs will begin. Field
drill the bolt hole on the horizontal
seam and 4-5 more from top to bot-
tom on the wall bracket and secure.
Use 5/16” x 1 1/4” bolt to attach wall
bracket.
Note: The top of the wall bracket
should line up with the corruga-
tion at the eave.