beautypg.com

33'-48' flat top instructions, Roof assembly instructions – Grain Systems Tanks PNEG-1092 User Manual

Page 53

background image

10. Roof Assembly Instructions

PNEG-1092 30° Bin Roof Construction

53

33'-48' Flat Top Instructions

Figure 10D

* NOTE: On 33' (10.06 m) and 42' (12.80 m) roofs, the roof nose bolt cannot be shared with the platform
hold down strap. Locate six (6) equally spaced bolts in the bottom row of the 6' (1.83 m) “Z” collar to
accept this strap on these roofs. Double nut the six (6) bolt locations as shown on detail “A”

.

Detail “A”