beautypg.com

Proper decal sheet placement – Grain Systems Tanks PNEG-1092 User Manual

Page 15

background image

2. Decals

PNEG-1092 30° Bin Roof Construction

15

Proper Decal Sheet Placement

Prior to beginning roof construction, it is necessary to build at least 1 ring of the bin.

Refer to the Bin/Silo construction manual you received with the bin. This manual will be packaged in the
sidewall hardware box.

Note for several of the lines (WS, FC and NS), the sidewall sheet has a “top” and “bottom”. It is important
to refer to these details.

Figure 2B