beautypg.com

8 switch-on phase – VEGA VEGABAR 55 Profibus PA - climate compensated User Manual

Page 24

background image

24

5 Connecting to power supply

VEGABAR 55 • Profibus PA - climate compensated

39442-EN-130321

1 2 3 4

6

3

4

1

2

5

Fig. 21: Connection of the sensor in the housing socket
1 Brown

2 Blue

3 Yellow

4 White

5 Shielding

6 Breather capillaries

I2C

Display

1

1

2

5

6

7

8

Fig. 22: Wiring plan external electronics
1 Voltage supply

5.8 Switch-on phase

After VEGABAR 55 is connected to voltage supply or after voltage

recurrence, the instrument carries out a self-check for approx. 30

seconds. The following steps are carried out:

Internal check of the electronics

Indication of the instrument type, the firmware as well as the sen-

sor TAGs (sensor designation)

Status byte goes briefly to fault value

Then the current measured value will be displayed and the corre-

sponding digital output signal will be outputted to the cable.

2)

Terminal compartment,

housing socket

Wiring plan external

electronics

Switch-on phase