beautypg.com

5 switch-on phase – VEGA VEGASON 63 4 … 20 mA_HART - two-wire User Manual

Page 23

background image

23

5 Connecting to power supply

VEGASON 63 • 4 … 20 mA/HART - two-wire

28777-EN-130417

I2C

1

1

2

Fig. 22: Wiring plan, double chamber housing
1 Voltage supply, signal output

5.5 Switch-on phase

After connecting VEGASON 63 to power supply or after a voltage

recurrence, the instrument carries out a self-check for approx. 30

seconds:

Internal check of the electronics

Indication of the instrument type, the firmware as well as the sen-

sor TAGs (sensor designation)

Output signal jumps briefly (approx. 10 seconds) to the set fault

current

Then the corresponding current is outputted to the cable (the value

corresponds to the actual level as well as the settings already carried

out, e.g. factory setting).

Wiring plan

Switch-on phase