5 Connecting to power supply

VEGASON 63 • 4 … 20 mA/HART - four-wire

28780-EN-130417

suppressed, but the protective effect against high frequency interfer-

ence signals remains.

Warning:

Considerable potential differences exist inside galvanic plants as well

as vessels with cathodic corrosion protection. Very large equalisa-

tion currents can flow through the cable screen when the screen

is grounded on both ends. To avoid this, the cable screen must be

connected to ground potential only on one end (inside the switch-

ing cabinet) in such applications. The cable screen must not be

connected to the internal ground terminal in the sensor and the outer

ground terminal on the housing not to potential equalisation!
Information:

The metallic parts of the instrument (transmitter, process fitting, etc.)

are conductively connected with the inner and outer ground terminal

on the housing. This connection exists either as a direct metallic

contact or via the shielding of the special connection cable on instru-

ments with external electronics. You can find specifications on the po-

tential connections within the instrument in chapter "Technical data".

Take note of the corresponding installation regulations for Ex applica-

tions. In particular, make sure that no potential equalisation currents

flow over the cable screen. In case of grounding on both sides this

can be achieved by the use of a capacitor or a separate potential

equalisation.
With the Exd version, the minus side of the signal output is galvani-

cally connected to ground via protective diodes. When connecting the

instrument to a grounded PLC, equalising currents can flow in case

of potential differences which can cause malfunctions. Make sure

that there is sufficient potential equalisation from the system side or

realise the connection via switching amplifier.

5.2 Connection procedure

Proceed as follows:
1. Unscrew the housing cover
2. Loosen compression nut of the cable entry
3. Remove approx. 10 cm (4 in) of the cable mantle (current output),

strip approx. 1 cm (0.4 in) insulation from the ends of the indi-

vidual wires

4. Insert the cable into the sensor through the cable entry
5. Lift the opening levers of the terminals with a screwdriver
6. Insert the wire ends into the open terminals according to the wir-

ing plan

7. Press down the opening levers of the terminals, you will hear the

terminal spring closing

8. Check the hold of the wires in the terminals by lightly pulling on

them

9. Connect the screen to the internal ground terminal, connect the

outer ground terminal to potential equalisation

Installation with Ex

applications