beautypg.com

Adjustment, Integration time, Setup – VEGA D84 Hydrostatic pressure transmitter User Manual

Page 25: An integration time t

background image

Pressure transmitter D84

25

Setup

Adjustment

For adjustment of zero and span, an amme-
ter must be connected to terminals 1 and 3.
The measured value is identical to the output
current.

1 Adjustment of zero

(e.g. process pressure zero or empty ves-
sel)
• Set rotary switch to zero.
• By pushing the "+" and "–" keys simultane-

ously, the current jumps directly to 4 mA or
you can adjust a current of 4 mA with the
"+" and "–" keys.

Adjustment range of zero:
-20 % … +95 % of nominal measuring range
(corresponds to a turn up of up to +95 %)

2 Adjustment of span

(e.g. process pressure or level at maximum)
• Set rotary switch to span.
• By pushing the "+" and "–" keys simultane-

ously, the current jumps directly to 20 mA
or you can adjust a current of
20 mA with the "+" and "–" keys.

Adjustment range of span:
3.3 % … 120 % of nominal measuring range
(corresponds to a turn down 1 : 30)

Note:

- A modification of zero does not influence

the span, i.e. the measuring range final
value is simply shifted.

- It is also possible to adjust currents for

partial fillings or partial pressures, e.g.
8 mA for 25 % and 16 mA for 75 %.The
pressure transmitter then automatically
calculates the values for 0 % or 100 %
(only possible with a level difference
>3.3 %).

Integration time

An integration time t

i

of 0 … 10 s can be ad-

justed to damp pressure shocks.

Procedure
• Set rotary switch to t

i

.

• By pushing the "-" 10 times, make sure that

the integration time is set to 0 s.

• For each 1 s of requested integration time,

the "+" key has to be pushed once.

Bedieneinsatz

operating unit

S

Z

t

i

Op

4

3

2

1

5

+

-

12V...36V DC

4...20mA